Cabling the Mills Cross Radar

Cabling the Mills Cross Radar

The T-shaped Mills Cross Radar panels are placed on balloons and covered with plywood with a stiffening tower on top. Stephen, Charles and Daniel are mounting all the cables for the transmitters, recievers and gps control. All the cables are attached to the racks in the back of the PistenBully and at the end of the day all cables were attached. We are very excited to see the first results tomorrow.

What we did during the day:

  1. CFA measurements of 35 bags, last bag 3556.
  2. PP measurements, last bag 3837
  3. Station for atmospheric moisture sampling and isotopic measurement is active.
  4. Connected cables and gps to racks in PistenBully
  5. Continued work on rover
  6. Prepared the AWI RAMAC radar for a profile to the 50 km upstream shallow coring site
  7. Made order in mechanic garage
  8. Moved glycol drum to mechanic garage

EGRIP population is 23

Weather: Wind from 8kts increasing to 17kts, gusting 18 kts from WSW turning to NW . Sunny all day with ground fog in the evening. Temperatures from -17°C to -13°C.