June 29, 2016
Thomas working on the wooden floor in the drill trench.
One of the tasks we have for this period is to make a plywood floor in the drill trench. Our carpenter Thomas with Nikolas, Christian and Camilla as helpers worked all day on the floor. We are planning the floor to be ready for Saturday and will test the perfectly levelled floor with a bowling tournament.
What we have done today:
Ad 3. The snow is already closing in around the staircase in the vertical ballon shaft. We cleared the snow away so the staircase is free again.
Ad 6. Our water use has increased. The water system was checked for leaks but none where found.
Ad 7. Josefine is totally spoiling us with fantastic food. For lunch chicken with risotto with canterel, for dinner creamy potato soup with fresh bread, potato omelet and various salads and for dessert crunchy apple with cream. (I apologize for my too simplified description of the meals)
Weather today: Sunny all day. Temperature -16°C last night increasing to -7°C in the afternoon Wind 6-10 kt from SW.
FL, Dorthe Dahl-Jensen
Chef Josefine in the EGRIP kitchen.