May 17, 2017
Drillers inserting casing tubes. The shape of the system is built for our picture format, albeit sideways….
Tomorrow we expect a plane with more equipment, some spareparts, food and new people. Some will also leave the camp; but for the ones who stay, the rhythm of camp life will change as it normally does when new people arrive. We are also looking forward to new food supplies as we are out of fresh vegetables.
What we did today:
Ad. 2 and 4: Drillers completed the casing operation. The process has been documented on camera. For the first time, the drillers also lowered a camera down the borehole for a live recording of the final sealing of the casing pipe against the borehole wall. The electronic packages of the drill are being repaired and checked by Jens Christian and Bruno.
Weather today: Sunshine most of the day, high thin overcast in the morning. Temp. -12°C to -21°C. Wind: 10 - 15 kt from WSW. Visibility: To horizon.
FL, J.P. Steffensen