August 13, 2019
Skier 31 at EGRIP
Finally the day came with a mission to EGRIP. The first pull-out mission was planned for 7 August so it has been a long wait – but the circumstances have also been unusual. Departure of the Skier from Kangerlussuaq was late – 16.35 – and many at EGRIP had already given up having a mission this Tuesday. When the Skier was enroute the camp became very active hauling ice core boxes up from the trenches and non-freeze equipment from the warm generator cabin. The mission went really well with an impressive take-off from camp. Thanks to the Skier 31 crew and all supporting the Skier.
What we did during the day:
EGRIP population is 5
Weather: Wind 5 kts to 9 kts. Wind from SW. Sunny with temperatures between -23°C and -13 °C.
FL, Dorthe Dahl-Jensen